The Recovery Plan – another delay and new changes

Just when we thought that the National Recovery and Resilience Plan (NRRP), through which Bulgaria will receive 13 billion leva from the Mechanism for Recovery and Resilience (MRR), is finally ready, changes were made once again. The final (fifth) version was submitted to the European Commission (EC) in October 2021 (IME analysis), what followed was a leak of some of the EC’s notes, a few public council meetings, organized by the Minister of Finance, reworking of the plan and another delay for EC assessment – until the 15th of April.

Concurrently, the reworking of the projects is incredibly vague. The announced projects include not just reworking of old ones but entirely new as well. There is one more group, comprised of new projects, but with the numbering of old ones which leaves it unclear if the old ones are being dropped. There is a lack of clarity whether the new final report will be published in its entirety, so that it can be observed at the expense of what will these new projects be realized.

Updated projects for NRRP, the 11th of March 2022

Component

Project

Old sum

New sum

Intelligent industry  

Program for economic transformation (P8)

2 540 000 000

2 936 723 252

Low-carbon economy

National infrastructure for storing electrical energy from Hydroelectric Plants (RESTORE)

New project

1 562 815 420

Scheme for the support of the construction of minimum 1.4 GW Hydroelectric Plants and batteries in Bulgaria (H2)

2 659 928 800

2 006 681 580

Exploring and development of a pilot project for the combined production of thermal and electrical energy from geothermal sources (H3)

92 551 831

343 052 582

Digital Connectivity

 

Far-reaching deployment of the digital infrastructure on the territory of Bulgaria (P18)

632 177 458

632 725 733

Digital transformation of Bulgarian Post and provision of complex services (P49)

New project

101 664 043

Construction, development and optimization of the digital TETPA system and radio-relaying network, managed by the Ministry of Internal Affairs (TETPA)

New project

149 400 053

Transport connectivity  

Carrying out a reform in the service of passengers with rail transport in the near-city and in-between regional routes, via the purchase of a new movable composition. (H2-4)

Another project

1 436 800 000

Introducing the European system for train control (ERTMS) to the board equipment of motorway, zero-emission electric locomotives and zero-emission electric trains, which operate on the conventional railway network of the Republic of Bulgaria (H5)

Another project

126 000 000

Digitization on the far-reaching TEN-T network through an introduction of ERTMS level 3 in the railway segment Russe – Kaspichan (H6)

Another project

205 860 112

Construction of intermodal terminal in the central north region of planning in Bulgaria – Russe (H7)

Another project

51 949 433

Ensuring of a sustainable transport connectivity via construction of Stage 3 of Line 3 of the Sofia metro – metro station “Hadzhi Dimitar” – “Levski-G” (P24)

765 485 416

217 465 416

Healthcare

Creation of a system for providing airborne emergency aid (H9)

103 305 822

119 181 033

Development of a National System 112 and creation of a new system for accepting emergency communications and management of resources for the emergency response services based on a unitary platform, with the aim of improving the service Unitary European number 112 on the territory of the Republic of Bulgaria. (P48)

55 984 648

55 984 648

 

The new projects which appear in the latest actualization are:

– New project “National infrastructure for retaining electrical energy from Hydroelectric Plants” valued at over 1.5 billion leva, mainly for the purchase, installing and beginning the exploitation of national infrastructure of facilities for the storage of electrical energy with combined capacity of 6000 MWh. All requested funds will be provided from MRR while the investment will be executed by a newly-registered Ministry of Energy’s project company, which will partake in the operating of the facilities for energy storage.

–  New project “Digital transformation of Bulgarian Post and provision of complex services.” The project combined is over 100 million leva and includes some basic activities: 1) Renovating postal stations (25 million leva); 2) digital services (68 million leva); 3) Introducing tele-medical services for the population in over 450 remote areas (7 million leva); 4) Installation of recharge stations for electric automobiles (2 million leva).

– New project “Construction, development and optimization of the digital TETPA system and radio-relaying network, managed by the Ministry of Internal Affairs.” The project will cost approximately 150 million leva and mainly includes the increasing of the portion of radio coverage of TETPA from 75% to 95% of the country’s territory.

–  Project “Carrying out a reform in the service of passengers with rail transport in the near-city and in-between regional routes, via the purchase of a new movable composition.” The project is valued at nearly 1.5 billion leva and envisages the purchase of: 1) 42 train cars for the transportation of passengers from and to the inhabited areas around Sofia (Elin Pelin, Dragoman, Lakatnik, Bankya, Pernik, Radomir) and Plovdiv (Karlovo, Pazardzhik, Dimitrovgrad, Belozem, Assenovgrad); 2) fast trains, which can service the traveling between all larger cities in the country (mainly between Sofia, Plovdiv, Burgas, Varna, Russe, and Stara Zagora); 3) 16 electric battery maneuvering locomotives.

– Project “Introducing the European system for train control (ERTMS) to the board equipment of motorway, zero-emission electric locomotives and zero-emission electric trains, which operate on the conventional railway network of the Republic of Bulgaria”, which is presented with the numbering of project “Recovery of key for the climate ecosystems in execution of the Strategy of biological diversity of the EU and the aims of the European Green Deal” valued at 72 million leva. There is a chance that the latter will be dropped from the final version of the NRRP.

–  Project “Digitization on the far-reaching TEN-T network through an introduction of ERTMS level 3 in the railway segment Russe – Kaspichan”, which is presented with the numbering of project “Construction of National complex center and network for monitoring, control and management” valued at 199 million leva. There is a chance that the latter will be dropped from the final version of the NRRP.

–  Project “Construction of intermodal terminal in the central north region of planning in Bulgaria – Russe”, which is presented with the numbering of project “Modernization of the material base and introducing of information technologies for the improvement of the social support for the population from the Agency of social support” valued at 10 million leva. There is a chance that the latter will be dropped from the final version of the NRRP.

It is unclear the extent to which we can be certain that the new actualization will be the last and that soon we will witness the full and final version of the NRRP. Even more concerning is that the postponement and a series of changes leads to a delay in the work on the projects. There is a weakening in the pressure and stimulus for active work on numerous reforms, which (in large part) are aimed at improving the quality of management, efficiency of public expenses and the increase of the economy’s competitiveness.

 

*This document is funded by Active Citizens Fund Bulgaria through the Financial Mechanism of the European Economic Area and Norwegian Financial Mechanism. All its contents are the sole responsibility of Institute for Market Economics and do not represent in any way the views of the Financial Mechanism of the European Economic Area and Norwegian Financial Mechanism and Active Citizens Fund Bulgaria. (www.activecitizensfund.bg)